Given the hazardous nature of the construction industry world over, the need for an effective safety management system which aims at forestalling the risks and hazards inherent on site has been reiterated by recent studies and applicable laws. Studies however show that level of effectiveness differs from country to country; industry to industry and from company to company. This study therefore undertakes both qualitative and quantitative investigation into the safety management system of a Nigeria-based construction company in Abuja. Purposive sampling technique was adopted for data collection. The mean score method was used to analyse the most hazardous work items in building construction projects, result revealed that lift installation, electrical work, roof work, and steel structure, with mean scores of 4.03, 4.00, 3.40, and 3.80, respectively were the riskiest work items. The risk prioritization number were used to analyse safety risk assessment, result revealed that the highest medium risk level was installation of electrical work, roof work, and installation of lift, with average risk scores of 11.48, 11.01, and 10.74, respectively. It was concluded that most building construction activities in Abuja are deemed to be of medium risk; nonetheless, employees are still at risk of injury and accidents on sites that are tolerable. It is recommended that all construction safety plans include an acceptable risk assessment technique, with proper risk identification and prioritization being a requirement for effective risk management and control. It is expected that stakeholder understanding of the construction sector will extend in terms of identifying work items with high or low severity or frequency of risk, hence improving construction safety.
COVER PAGE
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWELDGEMENT
ABSTRACT
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF THE STUDY
1.2 PROBLEM STATEMENT
1.3 AIM AND OBJECTIVE OF THE STUDY
1.4 SIGNIFICANCE OF THE STUDY
1.5 SCOPE OF THE STUDY
1.6 LIMITATION OF THE STUDY
CHAPTER TWO
LITERATURE REVIEW
2.1 CONCEPTUAL REVIEW OF THE STUDY
2.2 THEORITICAL REVIEW OF THE STUDY
2.3 RISK MANAGEMENT PROCESS
CHAPTER THREE
METHODOLOGY
3.1 RESEARCH DESIGN
3.2 POPULATION OF THE STUDY
3.3 SAMPLE AND SAMPLING METHOD
3.4 METHOD OF DATA COLLECTION
3.5 DATA ANALYSIS
CHAPTER FOUR
4.1 RESULTS AND DISCUSSION
CHAPTER FIVE
5.1 CONCLUSION
5.2 RECOMMENDATION
REFERENCES
Safety Risk Assessment In The Construction Company: Management Perspective. (n.d.). UniTopics. https://www.unitopics.com/project/material/safety-risk-assessment-in-the-nigeria-construction-company-management-perspective/
“Safety Risk Assessment In The Construction Company: Management Perspective.” UniTopics, https://www.unitopics.com/project/material/safety-risk-assessment-in-the-nigeria-construction-company-management-perspective/. Accessed 22 November 2024.
“Safety Risk Assessment In The Construction Company: Management Perspective.” UniTopics, Accessed November 22, 2024. https://www.unitopics.com/project/material/safety-risk-assessment-in-the-nigeria-construction-company-management-perspective/
Here’s a typical structure for Safety Risk Assessment In The Construction Company: Management Perspective research projects:
- The title page of Safety Risk Assessment In The Construction Company: Management Perspective should include the project title, your name, institution, and date.
- The abstract of Safety Risk Assessment In The Construction Company: Management Perspective should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
- The introduction of Safety Risk Assessment In The Construction Company: Management Perspective should provide the background information, outline the research problem, and state the objectives and significance of the study.
- Review existing research related to Safety Risk Assessment In The Construction Company: Management Perspective, identifying gaps the study aims to fill.
- The methodology section of Safety Risk Assessment In The Construction Company: Management Perspective should describe the research design, data collection methods, and analytical techniques used.
- Present the findings of the Safety Risk Assessment In The Construction Company: Management Perspective research study using tables, charts, and graphs to illustrate key points.
- Interpret Safety Risk Assessment In The Construction Company: Management Perspective results, discussing their implications, limitations, and potential areas for future research.
- Summarize the main findings of the Safety Risk Assessment In The Construction Company: Management Perspective study and restate its significance.
- List all the sources you cited in Safety Risk Assessment In The Construction Company: Management Perspective project, following a specific citation style (e.g., APA, MLA, Chicago).