Refurbishment Of Fluid Flow Demonstration Unit

ABSTRACT

The refurbishment of the fluid flow demonstration unit was carried out in the Chemical Engineering pilot plant laboratory of the Institute of Management and Technology Enugu.
The refurbishment process was carried out to ensure adequate functioning of the unit, to allow the continuous use of equipment in the pilot plant, so that student would use it in understanding the nature of the flow of fluid through pipe lines, these process was also for the development of the knowledge of every one who carried out the operation.

The process involved in the refurbishment of the fluid flow demonstration unit were in stages and it started with the finding of faults, at this stage the equipment was operated to know where the possible fault would arise from, while water was passing through the cylindrical glass tube, it was not visible, which we noted was due to dirt’s cloged in the pipes internal surface. The storage tank was filled with clean water, when this water was pumped out, it was dirty then we noted also the storage tank was dirty. Some pipes were not held firmly to the board this was due to worn out clips, bolts and nuts, we also noticed leakages in some hose pipes.
Since the faults has been found we started servicing by first decoupling of the cylindrical glass tubes from the board one after the other with utmost care using screw drivers, spanners and pliers gradually all the tubes were removed from the board. After dismantling these tubes, sulphuric acid {H2S04}, detergent, water and brush which would be used for washing the pipes were brought in place, the sulphric acid was passed through the pipe to soften the dirt’s in the pipe, then the detergent was dissolved in water, with brushes of different sizes all the pipe were washed and rinsed with clean water and allowed to dry. After these a dry rag was soaked in detergent and water which was used in cleaning the board removing the stains and dirts from it, then it was allowed to dry. The board was later painted with a white oil paint using a brush to coat it first and allowed to dry then finally painted. The storage tank was also washed with detergent and water the allowed to dry, then it was painted with the aid of a brush both internally and externally. Some bolts, nuts, chips and hosepipe that was leaking were replaced.
Finally the fluid flow demonstration unit was brought back in place for use, giving the unit along lasting use, enabling the use in the Chemical Engineering pilot plant.

TABLE OF CONTENTS

Title page
Approval page
Dedication
Acknowledgement
Abstract
Table of content
Letter of transmittal

CHAPTER ONE:
INTRODUCTION

2.0 CHAPTER TWO
History of fluid flow
Fluid flow
Fluid flow in pipes
Fluid flow measurement
Equipment description

CHAPTER THREE:
REFURBISHMENT PROCEDURES

CHAPTER FOUR:
DISCUSSION

CHAPTER FIVE:
CONCLUSION AND
RECOMMENDATION
REFERENCES

APA

Refurbishment Of Fluid Flow Demonstration Unit. (n.d.). UniTopics. https://www.unitopics.com/project/material/refurishment-of-fluid-flow-demonstration-unit/

MLA

“Refurbishment Of Fluid Flow Demonstration Unit.” UniTopics, https://www.unitopics.com/project/material/refurishment-of-fluid-flow-demonstration-unit/. Accessed 22 November 2024.

Chicago

“Refurbishment Of Fluid Flow Demonstration Unit.” UniTopics, Accessed November 22, 2024. https://www.unitopics.com/project/material/refurishment-of-fluid-flow-demonstration-unit/

WORK DETAILS

Chapters:
5
Pages:
50
Words:
7347

Here’s a typical structure for Refurbishment Of Fluid Flow Demonstration Unit research projects:

  • The title page of Refurbishment Of Fluid Flow Demonstration Unit should include the project title, your name, institution, and date.
  • The abstract of Refurbishment Of Fluid Flow Demonstration Unit should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
  • The introduction of Refurbishment Of Fluid Flow Demonstration Unit should provide the background information, outline the research problem, and state the objectives and significance of the study.
  • Review existing research related to Refurbishment Of Fluid Flow Demonstration Unit, identifying gaps the study aims to fill.
  • The methodology section of Refurbishment Of Fluid Flow Demonstration Unit should describe the research design, data collection methods, and analytical techniques used.
  • Present the findings of the Refurbishment Of Fluid Flow Demonstration Unit research study using tables, charts, and graphs to illustrate key points.
  • Interpret Refurbishment Of Fluid Flow Demonstration Unit results, discussing their implications, limitations, and potential areas for future research.
  • Summarize the main findings of the Refurbishment Of Fluid Flow Demonstration Unit study and restate its significance.
  • List all the sources you cited in Refurbishment Of Fluid Flow Demonstration Unit project, following a specific citation style (e.g., APA, MLA, Chicago).
WORK DETAILS

Chapters:
5
Pages:
50
Words:
7347