Project Time Control In Building Construction

ABSTRACT

Everyday life on bridge construction sites is commonly characterized by enormous pressure due to time and costs as well as difficult logistic requirements. Modern process simulation tools can be applied with increasing success. Projects are often affected by unscheduled constraints and limitations, that give reason to deviate from the formerly optimized plan, and to find ad-hoc solutions, especially in the erection phase. In order to meet these requirements, simulation tools in the erection phase with a more specific database are needed. An approach based on accurate day-to-day data for the current project state at any time is needed. These data then facilitate the simulation of possible variations for ongoing optimization. At first, it is necessary to determine, which choice of data is significant and actually needed for evaluating the day-to-day status in bridge construction progress. Secondly, the required data must be captured as efficiently as possible during the ongoing working activities.

TABLE OF CONTENTS

i Abstract
ii Table of contents

CHAPTER ONE
1.0 Introduction
1.1 Background of the Study
1.2 Statement of Problems
1.3 Objective of The Study
1.4 Research Question
1.5 Scope of The Study
1.6 Significance of The Study

CHAPTER TWO
2.0 Introduction
2.1 Literature Review
2.2 Description of On-Site Status
2.3 Building Process
2.4 Evaluation of Sub-Processes
2.5 Construction Project Management
2.5.1 study and Practice
2.6 Design, Bid, Build Contracts
2.7 Construction Project Costs
2.8 Manual Handling In Building And Construction Industry
2.8 Cost Control, Monitoring And Accounting
2.9 Problems Of Project Time Control

CHAPTER THREE
3.1 Data Sources
3.2 Documents As Information Sources.
3.3 Instruments For Data Evaluation
3.4 Combining Process Modeling And Data Evaluation
3.5 Construction Methods And Description Of Complex Processes

CHAPTER FOUR
4.1 Current Status
4.2 Database Presentation And Statistical Indicators
4.3 Curve Shape Analysis For Completed High-Rise Construction Projects

CHAPTER FIVE
Conclusion
References

APA

Project Time Control In Building Construction. (n.d.). UniTopics. https://www.unitopics.com/project/material/project-time-control-in-building-construction/

MLA

“Project Time Control In Building Construction.” UniTopics, https://www.unitopics.com/project/material/project-time-control-in-building-construction/. Accessed 21 November 2024.

Chicago

“Project Time Control In Building Construction.” UniTopics, Accessed November 21, 2024. https://www.unitopics.com/project/material/project-time-control-in-building-construction/

WORK DETAILS

Chapters:
5
Pages:
68
Words:
15719

Here’s a typical structure for Project Time Control In Building Construction research projects:

  • The title page of Project Time Control In Building Construction should include the project title, your name, institution, and date.
  • The abstract of Project Time Control In Building Construction should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
  • The introduction of Project Time Control In Building Construction should provide the background information, outline the research problem, and state the objectives and significance of the study.
  • Review existing research related to Project Time Control In Building Construction, identifying gaps the study aims to fill.
  • The methodology section of Project Time Control In Building Construction should describe the research design, data collection methods, and analytical techniques used.
  • Present the findings of the Project Time Control In Building Construction research study using tables, charts, and graphs to illustrate key points.
  • Interpret Project Time Control In Building Construction results, discussing their implications, limitations, and potential areas for future research.
  • Summarize the main findings of the Project Time Control In Building Construction study and restate its significance.
  • List all the sources you cited in Project Time Control In Building Construction project, following a specific citation style (e.g., APA, MLA, Chicago).