Problem Of Compulsory Acquisition And Compensation Under The Land Use Act

A Case Study Of Akure Airport
ABSTRACT

The word land means different things to different people and in different context. These different meanings notwithstanding, land, since prehistoric time, has been of elemental significance to the affairs of man.
In this thesis the various interests compulsory acquired were looked into. The compensation paid for these interests were adequately examined to determine the adequacy of the compensation. In the payment of compensation, time factor was also considered to determine the effect of inflation on the amount payable, using interest rate as the parameter of measurement..
This study examined the evolution and formation of acquisition laws in Nigeria with a detailed examination of the public lands acquisition Act Cap – 167 and the Land Use Act of 1978 as its objective. Another objection of this study is to see whether the acquisition and compensation of Akure Airport actually conformed with the provision of the law.
The necessary data required for this study were collected through interview, relevant documents and records were examined in the ministry of lands and Housing Akure.
Finally, it was discovered that serving acquisition notice through the family head is adequately efficient and cost effective as against the4 provision of the Land Use Act. There was delay in payment of compensation. Also, no interest was paid for the delay in payment of compensation as provided for by the law.

TABLE OF CONTENTS

Title Page
Dedication
Acknowledgement
Abstract
Table Of Content

Chapter One
1.0 Introduction

1.1 Statement Of Problem
1.2 Aim And Objective
1.3 Significance Of Study
1.4 Research Methodology
1.5 Limitation And Scope Of Study

Chapter Two
2.0 Literature Review

2.1 Origin Of Compulsory Acquisition
2.2 The Public Lands Acquisition Act (Cap. 167), 1958
2.3 Compensation Under The Act
2.4 Basis For Compensation
2.5 Items For Compensation
2.6 The Land Tenure Law Of Northern Nigeria 1963
2.7 The Land Use Act Of 1978 (Decree No 6)
2.8 The Need For Compulsory Acquisition
2.9 Consequences Of Compulsory Acquisition

Chapter Three
3.0 Case Study Area

3.1 History And Description Of The Area
3.2 Ownership And Pattern Of Land Use In The Area
3.3 The Airport Site
3.4 Method / Procedure Of Acquisition Applied

Chapter Four
4.0 Data Presentation And Analysis

4.1 Sources Of Data
4.2 Method Of Data Collected
4.3 Description Of Statistics For Analysis Data

Chapter Five
5.0 Findings, Recommendation And Conclusion

5.1 Findings
5.2 Recommendation
5.3 Conclusion

APA

Problem Of Compulsory Acquisition And Compensation Under The Land Use Act. (n.d.). UniTopics. https://www.unitopics.com/project/material/problem-of-compulsory-acquisition-and-compensation-under-the-land-use-act/

MLA

“Problem Of Compulsory Acquisition And Compensation Under The Land Use Act.” UniTopics, https://www.unitopics.com/project/material/problem-of-compulsory-acquisition-and-compensation-under-the-land-use-act/. Accessed 21 November 2024.

Chicago

“Problem Of Compulsory Acquisition And Compensation Under The Land Use Act.” UniTopics, Accessed November 21, 2024. https://www.unitopics.com/project/material/problem-of-compulsory-acquisition-and-compensation-under-the-land-use-act/

WORK DETAILS

Chapters:
5
Pages:
59
Words:
9303

Here’s a typical structure for Problem Of Compulsory Acquisition And Compensation Under The Land Use Act research projects:

  • The title page of Problem Of Compulsory Acquisition And Compensation Under The Land Use Act should include the project title, your name, institution, and date.
  • The abstract of Problem Of Compulsory Acquisition And Compensation Under The Land Use Act should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
  • The introduction of Problem Of Compulsory Acquisition And Compensation Under The Land Use Act should provide the background information, outline the research problem, and state the objectives and significance of the study.
  • Review existing research related to Problem Of Compulsory Acquisition And Compensation Under The Land Use Act, identifying gaps the study aims to fill.
  • The methodology section of Problem Of Compulsory Acquisition And Compensation Under The Land Use Act should describe the research design, data collection methods, and analytical techniques used.
  • Present the findings of the Problem Of Compulsory Acquisition And Compensation Under The Land Use Act research study using tables, charts, and graphs to illustrate key points.
  • Interpret Problem Of Compulsory Acquisition And Compensation Under The Land Use Act results, discussing their implications, limitations, and potential areas for future research.
  • Summarize the main findings of the Problem Of Compulsory Acquisition And Compensation Under The Land Use Act study and restate its significance.
  • List all the sources you cited in Problem Of Compulsory Acquisition And Compensation Under The Land Use Act project, following a specific citation style (e.g., APA, MLA, Chicago).
WORK DETAILS

Chapters:
5
Pages:
59
Words:
9303