Installation Of Overhead Lines

ABSTRACT

An overhead power line is an electric power transmission line suspended by towers or poles. The purpose of this work is to outline the various requirements for, and the procedures one have followed in the design of overhead transmission lines. Numerous design studies, which have been made on specific aspects of transmission line design, are included with explanations of their applications. Information is presented concerning such aspects as selection of type of construction, conductor sags and tensions, insulation, lightning protection, clearance patterns, galloping conductors, structure limitation and guying charts, and structure spotting. Structure design examples are limited to wood-pole construction.

TABLE OF CONTENTS

TITLE PAGE

APPROVAL PAGE

DEDICATION

ACKNOWLEDGEMENT

ABSTRACT

TABLE OF CONTENT

CHAPTER ONE

 INTRODUCTION

1.1       BACKGROUND OF THE PROJECT

1.2      PROBLEM STATEMENT

1.3      AIM AND OBJECTIVE OF THE PROJECT

1.4      SCOPE OF THE PROJECT

1.5      SIGNIFICANCE OF THE PROJECT

CHAPTER TWO

2.0 LITERATURE REVIEW

2.1      OVERVIEW OF OVERHEAD POWER LINE

2.2    CLASSIFICATION OF TRANSMISSION LINES

2.3     HISTORICAL BACKGROUND OF THE STUDY

2.4      TYPES OF CONDUCTORS USED IN OVERHEAD POWER LINES.

CHAPTER THREE

3.0      METHODOLOGY

3.1      OVERHEAD TRANSMISSION LINES COMPONENTS

3.2      DESCRITION OF OVERHEAD ACCESSORIES

3.3      OVERHEAD TRANSMISSION LINE INSTALLATION PROCEDURE

CHAPTER FOUR

4.1      TYPES OF OVERHEAD TRANSMISSION LINE SUPPORTS

4.2      GENERAL CONSIDERATIONS FOR OVERHEAD LINE SUPPORT DESIGN

4.3      OVERHEAD LINES SAFETY MEASURES

CHAPTER FIVE

5.1      CONCLUSION

5.2       REFERENCES

CHAPTER ONE

1.0                                                             INTRODUCTION

1.1                                                BACKGROUND OF THE STUDY

The electrical power system comprises of three main subsystems: generation, transmission, and distribution. The transmission system is responsible for connecting the generation side to the consumption or distribution side.

Most of the power transmission systems are operating in Alternating Current (AC) with several high voltage levels that increases with the increase of the line length to reduce the transmission losses.

AC power transmission lines might be designed to be Overhead Transmission Lines (OHTL) or Underground Transmission Cables (UGTC). The majority of AC transmission lines are overhead transmission lines and the main reason is that the cost of underground cable system is considerably more compared to overhead lines. In general, OHTL are generally used for power transmission at long distances in open county and rural areas in addition to that, OHTL are generally with longer lifespan, easier to install and repair and require lower manufacturing & construction costs in comparison to UGTC. The main aim of this work is to study the installation process of overhead transmission line.

1.2                                                       PROBLEM STATEMENT

The Occupational Safety and Health Administration (OSHA), “…has estimated that an average of 12,976 lost-workday injuries to and 86 fatalities of electric power generation, transmission, and distribution employees occur annually. Using these figures, OSHA has also estimated the number of injuries which could be prevented by the new regulations. Taking into account such factors as existing regulation and the differences in training levels among utilities, OSHA estimated that 1,634 lost-workday injuries and 61 deaths could be prevented each year” (OSHA, 2019). This work was carried out to highlight the right procedure on how to work and safely installed overhead lines thereby increasing safety measures.

1.3                                          AIM AND OBJECTIVE OF THE STUDY

The purpose of this work is to outline the various requirements for, and the procedures to be followed in the design of an overhead transmission lines. The objectives are:

  1. Safely evaluate, manipulate, stabilize, and work around overhead lines
  2. Minimize electrical and physical/rigging hazards when installing and removing overhead lines.
  • Evaluate, inspect, and safely install an overhead lines

1.4                                                        SCOPE OF THE STUDY

The scope of this work covers the engineering tools and concepts that have proven to be successful over many years of transmission line design which have been made on specific aspects of transmission line design, are included with explanations of their applications.

1.5                                                SIGNIFICANCE OF THE STUDY

This work is not just a book, but a useful reference and guide for electrical designers. Information is presented concerning such aspects as selection of type of construction, conductor sags and tensions, insulation, lightning protection, clearance patterns, galloping conductors, structure limitation and guying charts, and structure spotting. Structure design examples are limited to wood-pole construction. Interpretations of the National Electrical Safety Code and other codes are made as required.

 

APA

Installation Of Overhead Lines. (n.d.). UniTopics. https://www.unitopics.com/project/material/installation-of-overhead-lines/

MLA

“Installation Of Overhead Lines.” UniTopics, https://www.unitopics.com/project/material/installation-of-overhead-lines/. Accessed 22 November 2024.

Chicago

“Installation Of Overhead Lines.” UniTopics, Accessed November 22, 2024. https://www.unitopics.com/project/material/installation-of-overhead-lines/

WORK DETAILS

Here’s a typical structure for Installation Of Overhead Lines research projects:

  • The title page of Installation Of Overhead Lines should include the project title, your name, institution, and date.
  • The abstract of Installation Of Overhead Lines should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
  • The introduction of Installation Of Overhead Lines should provide the background information, outline the research problem, and state the objectives and significance of the study.
  • Review existing research related to Installation Of Overhead Lines, identifying gaps the study aims to fill.
  • The methodology section of Installation Of Overhead Lines should describe the research design, data collection methods, and analytical techniques used.
  • Present the findings of the Installation Of Overhead Lines research study using tables, charts, and graphs to illustrate key points.
  • Interpret Installation Of Overhead Lines results, discussing their implications, limitations, and potential areas for future research.
  • Summarize the main findings of the Installation Of Overhead Lines study and restate its significance.
  • List all the sources you cited in Installation Of Overhead Lines project, following a specific citation style (e.g., APA, MLA, Chicago).
WORK DETAILS