This research work aims at critically evaluating the process of production and the extent to which the installed capacity of Nigerian breweries is utilized. The study traced the historical development of the company its range of product and the extent which its capacity is utilized.
In collecting data for the research, two sources of data collection were used. They are primary and secondary data sources. The primary data were got through personal outer view and observations. While secondary data were collected from Nigerian breweries Plc Enugu and other relevant materials and information centers.
From the analysis of the data collected, the following findings were made:
1. There is problem with the acquisition of spare parts because of the ` prohibitive price of foreign exchange.
2. Poor maintenance of frequent machine breakdown. Statistics are not kept on the performance of machine.
3. Inadequate of raw materials which is one of the factors to the full utilization of the installed capacity.
4. Power failure breakdown on the production process. Despite the installation of 15 – mega watts electric generating plant as a safeguard against intermittent power supply from national electric power authority (NEPA) the company still suffer from power supply problem.
Based on the above findings, the following recommendations were offered after analyzing.
1. The rate of breakdown of machineries will prevent the [purchase of out model. Recommendation of periodic maintenance of machine should be adopted to reduce incidence of breakdown.
2. There is high cost of certain items, like beer which makes the consumption low. It was recommended that the company should be dong an objective pricing if its goods so that it does not price itself out of the market.
3. There is not enough training and development of staffs for the proper handing of the facilities of production industries it was recommended that enough training and development of staff should be provided the company. It will enable them to shift emphasis on keeping track of manufacturing line cost to facilities of production.
Title page
Dedication
Approval and certification
Acknowledgment
Abstract
Table of content
CHAPTER ONE
1.0 Introduction
1.1 Background of the study
1.2 Statement of problems
1.3 Objective of study
1.4 Statement of hypothesis
1.5 Significations of study
1.6 Limitation of study
1.7 Scope of the study
CHAPTER TWO
LITERATURE REVIEW
2.1 Definition of concepts
2.2 Productions planning and control
2.3 Activities involved in production planning and control
2.4 Production process and design
2.5 Capacity utilization
2.6 Material handling
2.7 Peak versus normal lead capacity
2.8 Productions planning and activities in Nigerian breweries
2.9 Inventory control
CHAPTR THREE
RESEARCH DESIGN AND METHODOLOGY
3.1 Research methods used
3.2 Sources of data
3.3 Investigation procedure
3.4 Population and sample size determination
3.5 Treatments of data.
CHAPTER FOUR
PRESENTATION ANALYSIS AND INTERPRETATION OF DATA.
CHAPTER FIVE
SUMMARY OF FINDINGS, CONCLUSION AND RECOMMENDATIONS.
5.1 Summary of finds
5.2 Recommendation
5.3 Conclusion
BIBLIOGRAPHY
APPENDIX A: QUESTIONNAIRE FOR MANAGEMENT
APPENDIX B: QUESTION FOR WORKERS.
Evaluation Of Production Process And Capacity Utilization. (n.d.). UniTopics. https://www.unitopics.com/project/material/evaluation-of-production-process-and-capacity-utilization/
“Evaluation Of Production Process And Capacity Utilization.” UniTopics, https://www.unitopics.com/project/material/evaluation-of-production-process-and-capacity-utilization/. Accessed 23 November 2024.
“Evaluation Of Production Process And Capacity Utilization.” UniTopics, Accessed November 23, 2024. https://www.unitopics.com/project/material/evaluation-of-production-process-and-capacity-utilization/
Here’s a typical structure for Evaluation Of Production Process And Capacity Utilization research projects:
- The title page of Evaluation Of Production Process And Capacity Utilization should include the project title, your name, institution, and date.
- The abstract of Evaluation Of Production Process And Capacity Utilization should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
- The introduction of Evaluation Of Production Process And Capacity Utilization should provide the background information, outline the research problem, and state the objectives and significance of the study.
- Review existing research related to Evaluation Of Production Process And Capacity Utilization, identifying gaps the study aims to fill.
- The methodology section of Evaluation Of Production Process And Capacity Utilization should describe the research design, data collection methods, and analytical techniques used.
- Present the findings of the Evaluation Of Production Process And Capacity Utilization research study using tables, charts, and graphs to illustrate key points.
- Interpret Evaluation Of Production Process And Capacity Utilization results, discussing their implications, limitations, and potential areas for future research.
- Summarize the main findings of the Evaluation Of Production Process And Capacity Utilization study and restate its significance.
- List all the sources you cited in Evaluation Of Production Process And Capacity Utilization project, following a specific citation style (e.g., APA, MLA, Chicago).