Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism

ABSTRACT

This project presents the concept of a control system into an automatic water pump controller. One of the motivations for this project is the need to bring a solution to the problem of water shortage in various places eliminating the major culprit, waste of water during pumping, dispensing into overhead tank and flushing the water out from the tank. I believe that creating a barrier to wastage will not only provide more financial gains and energy saving, but will also help the environment and water cycle which in turn ensures that we save water for our future. Several circuits are put together to ensure proper working of this design, and the block diagram includes the supply unit, the micro- processor unit, the sensor unit, the display unit and the pump drives unit. The power unit is responsible for turning on the entire circuit. Some components are used to set up power unit and they include; a 12v step down transformer, a bridge rectifier circuit, a smoothening capacitor and a voltage regulator IC. The microprocessors control virtually all the actions carried out in this design. The sensor unit is responsible for sensing the level of water and transfer the current position of water to the microprocessor. The display unit in the circuit is use to physically show the current position of water in the tank. Experimental performance results indicated that this device is quite suitable for the desired operation, since it maintained the set maximum and minimum levels of respectively, by switching the pump ON/OFF as required. Thus this helps in reducing wastage of water also as electricity. To justify the benefits that can be accrued from this system, cost reduction, less human contact means less cost in terms of labour, maintenance, and utility bills waste.

TABLE OF CONTENTS

COVER PAGE
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWLEDGEMENT
ABSTRACT

CHAPTER ONE
1.0 INTRODUCTION
1.1 BACKGROUND OF THE STUDY
1.2 PROBLEM STATEMENT
1.3 AIM AND OBJECTIVES OF THE PROJECT
1.4 SCOPE AND DELIMITATION
1.5 APPLICATION OF THE PROJECT
1.6 SIGNIFICANCE OF PROJECT
1.7 METHODOLOGY
1.8 PROJECT ORGANISATION

CHAPTER TWO
LITERATURE REVIEW
2.1 REVIEW OF DIFFERENT TYPES OF WATER SENSOR
2.2 HISTORICAL BACKGROUND OF ARDUINO
2.3 DEVELOPMENT OF ARDUINO
2.4 OVERVIEW OF ULTRASONIC SENSOR
2.5 ULTRASONIC DISTANCE SENSOR WORKINGS
2.6 USES ULTRASONIC SENSORS
2.7 REVIEW OF THE RELATED STUDY

CHAPTER THREE
METHODOLOGY
3.1 BLOCK DIAGRAM
3.2 DESCRIPTION OF COMPONENTS USED
3.3 SYSTEM CIRCUIT DIAGRAM
3.4 CIRCUIT DESCRIPTION
3.5 WORKING OPERATION
3.6 PROGRAMMING
3.7 PROGRAMMABLE DIGITAL TIMER
3.8 TIMED CIRCUIT DIAGRAM
3.9 SOFTWARE
3.10 WORKING PRINCIPLE
3.11 DESIGN NOTE

CHAPTER FOUR
4.0 RESULT ANALYSIS
4.1 CONSTRUCTION PROCEDURE
4.2 CASING AND PACKAGING
4.3 ASSEMBLING OF SECTIONS
4.4 PACKAGING
4.5 MOUNTING PROCEDURE
4.6 TESTING

CHAPTER FIVE
5.1 CONCLUSION
5.2 RECOMMENDATION
REFERENCES

APA

Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism. (n.d.). UniTopics. https://www.unitopics.com/project/material/design-and-construction-of-an-automatic-water-pump-controller-with-water-timed-flushing-mechanism/

MLA

“Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism.” UniTopics, https://www.unitopics.com/project/material/design-and-construction-of-an-automatic-water-pump-controller-with-water-timed-flushing-mechanism/. Accessed 22 November 2024.

Chicago

“Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism.” UniTopics, Accessed November 22, 2024. https://www.unitopics.com/project/material/design-and-construction-of-an-automatic-water-pump-controller-with-water-timed-flushing-mechanism/

WORK DETAILS

Chapters:
5
Pages:
65
Words:
7929

Here’s a typical structure for Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism research projects:

  • The title page of Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism should include the project title, your name, institution, and date.
  • The abstract of Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
  • The introduction of Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism should provide the background information, outline the research problem, and state the objectives and significance of the study.
  • Review existing research related to Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism, identifying gaps the study aims to fill.
  • The methodology section of Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism should describe the research design, data collection methods, and analytical techniques used.
  • Present the findings of the Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism research study using tables, charts, and graphs to illustrate key points.
  • Interpret Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism results, discussing their implications, limitations, and potential areas for future research.
  • Summarize the main findings of the Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism study and restate its significance.
  • List all the sources you cited in Design And Construction Of An Automatic Water Pump Controller With Water Timed Flushing Mechanism project, following a specific citation style (e.g., APA, MLA, Chicago).