Design And Construction Of An Accurate Foot-Switch

Certain industrial controls require accurate switching operations. For example, in case of a foot-switch for precise drilling work, even a small error in switching may cause considerable loss. This low-cost but accurate foot-operated switch can prevent that.

The heart of the circuit is IC NE555 timer which is wired in one-shot mode. Its output pin 3 goes high only when both switches S1 and S2 are pressed simultaneously. You can release any one of the switches without changing the output state. When you release both the switches, the output goes low. The switches are placed under a foot paddle. LED1 is used as a warning indicator. If either S1 or S2 gets pressed erroneously, LED1 blinks to warn the operator. The operator can then withdraw his foot in case of a mistake or depress the other switch also to trigger the circuit. LED1 is to be mounted on the operator’s desk.

 

TABLE OF CONTENTS

TITLE PAGE

APPROVAL PAGE

DEDICATION

ACKNOWLEDGEMENT

ABSTRACT

TABLE OF CONTENT

CHAPTER ONE

1.0      INTRODUCTION

1.1      BACKGROUND OF THE PROJECT
1.2      AIM OF THE PROJECT
1.3      OBJECTIVE OF THE PROJECT
1.4      SIGNIFICANCE OF THE PROJECT
1.5      PURPOSE OF THE PROJECT
1.6      APPLICATION OF THE PROJECT
1.7      ADVANTAGES OF THE PROJECT
1.8      PROBLEM/LIMITATION OF THE PROJECT
1.9      PROJECT ORGANISATION

CHAPTER TWO

2.0     LITERATURE REVIEW

2.1      REVIEW OF RELATED STUDIES

2.2      REVIEW OF RELATED TERMS

2.3      REVIEW OF 555 TIMER IC

CHAPTER THREE

3.0     CONSTRUCTION METHODOLOGY

3.1      SYSTEM CIRCUIT DIAGRAM

3.2     SYSTEM OPERATION

3.3     CIRCUIT DESCRIPTION

3.4     SYSTEM CIRCUIT DIAGRAM

3.5      CIRCUIT OPERATION

3.6     IMPORTANCE AND FUNCTION OF THE MAJOR COMPONENTS USED IN THIS CIRCUIT

3.7      POWER SUPPLY UNIT

CHAPTER FOUR

RESULT ANALYSIS

4.0      CONSTRUCTION PROCEDURE AND TESTING

4.1      CASING AND PACKAGING

4.2      ASSEMBLING OF SECTIONS

4.3      TESTING

4.4.1 PRE-IMPLEMENTATION TESTING

4.4.2 POST-IMPLEMENTATION TESTING

4.5      RESULT

4.6     COST ANALYSIS

4.7      PROBLEM ENCOUNTERED

CHAPTER FIVE

5.1      CONCLUSION

5.2      RECOMMENDATION

5.3      REFERENCES

 

3.1                                                       BLOCK DIAGRAM

Before carrying out any project, the block diagram must be drawn and fully understood. Block diagram gives a pictorial understanding of any work. The block diagram of the system is as below:

 

Fig. 1: Circuit of the foot-switch

The switches are placed under a foot paddle as shown in Fig. 2. LED1 is used as a warning indicator. If either S1 or S2 gets pressed erroneously, LED1 blinks to warn the operator. The operator can then withdraw his foot in case of a mistake or depress the other switch also to trigger the circuit. LED1 is to be mounted on the operator’s desk.

The circuit operation is simple. Resistors R2, R3 and R4 form a voltage divider. IC NE555 has two comparators, a flip-flop and power output section built into it. Pressing either S1 or S2 puts the input voltage between the upper comparator (2/3Vcc) and the lower comparator (1/3Vcc). Thus, it has no effect on the state of the internal flip-flop of IC NE555. Pressing the two switches simultaneously sets the flip-flop and the output of NE555 goes high. Transistor T2 energises relay RL1 for driving the load.

Fig. 2: Foot paddle switch

 

Releasing any of the switches brings the comparator voltage back to the initial level inside NE555 and it has no effect on the state of the flip-flop. Releasing both the switches brings the input level with respect to ground below the low trigger level, and thus it resets the output.

Use of the voltage divider results in stable operation over the entire permissible supply voltage range. The RC circuit at pin 4 provides power-on reset.

When only S1 is pressed, R3 (1 kilo-ohm) is less than R5 (1.5 kilo-ohms) and IC1 is not triggered. However, transistor T1 (BC548) gets forward biased and LED1 glows. When both S1 and S2 are pressed, the effective resistance between +Vcc and pin 2 of IC1 is about 500 ohms, which is less than R5 (1.5 kilo-ohms), and IC NE555 gets triggered.

APA

Design And Construction Of An Accurate Foot-Switch. (n.d.). UniTopics. https://www.unitopics.com/project/material/design-and-construction-of-an-accurate-foot-switch/

MLA

“Design And Construction Of An Accurate Foot-Switch.” UniTopics, https://www.unitopics.com/project/material/design-and-construction-of-an-accurate-foot-switch/. Accessed 22 November 2024.

Chicago

“Design And Construction Of An Accurate Foot-Switch.” UniTopics, Accessed November 22, 2024. https://www.unitopics.com/project/material/design-and-construction-of-an-accurate-foot-switch/

WORK DETAILS

Here’s a typical structure for Design And Construction Of An Accurate Foot-Switch research projects:

  • The title page of Design And Construction Of An Accurate Foot-Switch should include the project title, your name, institution, and date.
  • The abstract of Design And Construction Of An Accurate Foot-Switch should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
  • The introduction of Design And Construction Of An Accurate Foot-Switch should provide the background information, outline the research problem, and state the objectives and significance of the study.
  • Review existing research related to Design And Construction Of An Accurate Foot-Switch, identifying gaps the study aims to fill.
  • The methodology section of Design And Construction Of An Accurate Foot-Switch should describe the research design, data collection methods, and analytical techniques used.
  • Present the findings of the Design And Construction Of An Accurate Foot-Switch research study using tables, charts, and graphs to illustrate key points.
  • Interpret Design And Construction Of An Accurate Foot-Switch results, discussing their implications, limitations, and potential areas for future research.
  • Summarize the main findings of the Design And Construction Of An Accurate Foot-Switch study and restate its significance.
  • List all the sources you cited in Design And Construction Of An Accurate Foot-Switch project, following a specific citation style (e.g., APA, MLA, Chicago).
WORK DETAILS