Design And Construction Of A Water Tank Overflow Indicator

ABSTRACT

Water is a vital but scarce natural resource. To prevent water wastage, this water tank overflow indicator comes in handy. It gives audio as well visual alarm whenever the water tank overflows. When water in the tank touches the metal plate sensors, it extends ground to pin 2 of IC1. Now pin 3 of IC1 is at a higher potential than pin 2. The high output of the op-amp generates 3.1V across zener diode ZD1. Melody generator IC2 produces a melody, which drives the transistor to light up LED1 and sound an alarm from the loudspeaker.

TABLE OF CONTENTS

COVER PAGE

TITLE PAGE

APPROVAL PAGE

DEDICATION

ACKNOWELDGEMENT

ABSTRACT

CHAPTER ONE

1.0      INTRODUCTION

1.1      BACKGROUND OF THE PROJECT

  • PURPOSE OF THE PROJECT
  • AIM OF THE PROJECT
  • OBJECTIVE OF THE PROJECT
  • PURPOSE OF THE PROJECT
  • LIMITATION OF THE PROJECT
  • ADVANTAGES OF THE PROJECT
  • PROBLEM OF THE PROJECT
  • APPLICATION OF THE PROJECT
  • RESEARCH QUESTION
  • PROJECT ORGANISATION

CHAPTER TWO

LITERATURE REVIEW

  • OVERVIEW OF THE STUDY
  • REVIEW OF THE RELATED STUDY

CHAPTER THREE

3.0     CONSTRUCTION METHODOLOGY

3.1      BASIC OF THE SYSTEM

3.2      BLOCK DIAGRAM OF THE SYSTEM

3.3      SYSTEM OPERATION

3.4      CIRCUIT DIAGRAM

3.5      CIRCUIT DESCRIPTION

3.6     DESCRIPTION OF COMPONENTS USED

3.7      POWER SUPPLY UNIT

CHAPTER FOUR

4.0      TESTING AND RESULTS

  • CONSTRUCTION PROCEDURE AND TESTING
  • INSTALLATION OF THE COMPLET DESIGN
  • ASSEMBLING OF SECTIONS
  • TESTING OF SYSTEM OPERATION
  • COST ANALYSIS

CHAPTER FIVE

  • CONCLUSION
  • RECOMMENDATION
  • REFERENCES
APA

Design And Construction Of A Water Tank Overflow Indicator. (n.d.). UniTopics. https://www.unitopics.com/project/material/design-and-construction-of-a-water-tank-overflow-indicator/

MLA

“Design And Construction Of A Water Tank Overflow Indicator.” UniTopics, https://www.unitopics.com/project/material/design-and-construction-of-a-water-tank-overflow-indicator/. Accessed 23 November 2024.

Chicago

“Design And Construction Of A Water Tank Overflow Indicator.” UniTopics, Accessed November 23, 2024. https://www.unitopics.com/project/material/design-and-construction-of-a-water-tank-overflow-indicator/

WORK DETAILS

Here’s a typical structure for Design And Construction Of A Water Tank Overflow Indicator research projects:

  • The title page of Design And Construction Of A Water Tank Overflow Indicator should include the project title, your name, institution, and date.
  • The abstract of Design And Construction Of A Water Tank Overflow Indicator should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
  • The introduction of Design And Construction Of A Water Tank Overflow Indicator should provide the background information, outline the research problem, and state the objectives and significance of the study.
  • Review existing research related to Design And Construction Of A Water Tank Overflow Indicator, identifying gaps the study aims to fill.
  • The methodology section of Design And Construction Of A Water Tank Overflow Indicator should describe the research design, data collection methods, and analytical techniques used.
  • Present the findings of the Design And Construction Of A Water Tank Overflow Indicator research study using tables, charts, and graphs to illustrate key points.
  • Interpret Design And Construction Of A Water Tank Overflow Indicator results, discussing their implications, limitations, and potential areas for future research.
  • Summarize the main findings of the Design And Construction Of A Water Tank Overflow Indicator study and restate its significance.
  • List all the sources you cited in Design And Construction Of A Water Tank Overflow Indicator project, following a specific citation style (e.g., APA, MLA, Chicago).
WORK DETAILS