Design And Construction Of A Musical Water Shower

ABSTRACT

This work is on a musical water shower. It plays different tunes repeatedly for as long as your shower is turned on. The music starts as soon as water comes out of the shower. The music stops when you turn the shower ‘off’ and water stops coming out of it.

It comprises transistors T1 and T2 which form a complementary amplifier pair, transistor T3 acting as a switch and a 12-tone melody generator IC M3482. The M3482 is a mask-ROM-programmed IC designed to play melodies according to the programmed data. Its inbuilt preamplifier provides a simple interface to the driver circuit formed by transistors T4 and T5. The IC can be replaced with other UM348xx series, WR630173 or WE4822 melody generator ICs.

TABLE OF CONTENTS

COVER PAGE

TITLE PAGE

APPROVAL PAGE

DEDICATION

ACKNOWELDGEMENT

ABSTRACT

CHAPTER ONE

1.0      INTRODUCTION

1.1      BACKGROUND OF THE PROJECT

  • PURPOSE OF THE PROJECT
  • AIM OF THE PROJECT
  • OBJECTIVE OF THE PROJECT
  • PURPOSE OF THE PROJECT
  • LIMITATION OF THE PROJECT
  • ADVANTAGES OF THE PROJECT
  • PROBLEM OF THE PROJECT
  • APPLICATION OF THE PROJECT
  • RESEARCH QUESTION
  • PROJECT ORGANISATION

CHAPTER TWO

LITERATURE REVIEW

  • OVERVIEW OF THE STUDY
  • REVIEW OF THE RELATED STUDY

CHAPTER THREE

3.0     CONSTRUCTION METHODOLOGY

3.1      BASIC OF THE SYSTEM

3.2      BLOCK DIAGRAM OF THE SYSTEM

3.3      SYSTEM OPERATION

3.4      CIRCUIT DIAGRAM

3.5      CIRCUIT DESCRIPTION

3.6     DESCRIPTION OF COMPONENTS USED

3.7      POWER SUPPLY UNIT

CHAPTER FOUR

4.0      TESTING AND RESULTS

  • CONSTRUCTION PROCEDURE AND TESTING
  • INSTALLATION OF THE COMPLET DESIGN
  • ASSEMBLING OF SECTIONS
  • TESTING OF SYSTEM OPERATION
  • COST ANALYSIS

CHAPTER FIVE

  • CONCLUSION
  • RECOMMENDATION
  • REFERENCES

 

APA

Design And Construction Of A Musical Water Shower. (n.d.). UniTopics. https://www.unitopics.com/project/material/design-and-construction-of-a-musical-water-shower/

MLA

“Design And Construction Of A Musical Water Shower.” UniTopics, https://www.unitopics.com/project/material/design-and-construction-of-a-musical-water-shower/. Accessed 20 September 2024.

Chicago

“Design And Construction Of A Musical Water Shower.” UniTopics, Accessed September 20, 2024. https://www.unitopics.com/project/material/design-and-construction-of-a-musical-water-shower/

WORK DETAILS

Here’s a typical structure for Design And Construction Of A Musical Water Shower research projects:

  • The title page of Design And Construction Of A Musical Water Shower should include the project title, your name, institution, and date.
  • The abstract of Design And Construction Of A Musical Water Shower should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
  • The introduction of Design And Construction Of A Musical Water Shower should provide the background information, outline the research problem, and state the objectives and significance of the study.
  • Review existing research related to Design And Construction Of A Musical Water Shower, identifying gaps the study aims to fill.
  • The methodology section of Design And Construction Of A Musical Water Shower should describe the research design, data collection methods, and analytical techniques used.
  • Present the findings of the Design And Construction Of A Musical Water Shower research study using tables, charts, and graphs to illustrate key points.
  • Interpret Design And Construction Of A Musical Water Shower results, discussing their implications, limitations, and potential areas for future research.
  • Summarize the main findings of the Design And Construction Of A Musical Water Shower study and restate its significance.
  • List all the sources you cited in Design And Construction Of A Musical Water Shower project, following a specific citation style (e.g., APA, MLA, Chicago).
WORK DETAILS