This work is on change over selector switch for automatic toggling of an inverter when AC mains is present and vice versa and also the system must enable automatic switching of the battery charger such that when AC mains is present the inverter battery gets charged and when AC mains fails, the battery gets connected with the inverter for supplying AC to the load. The configuration should be such that everything takes place automatically and the appliances are never switched OFF, just reverted from inverter AC to Mains AC and vice versa during mains power failures and restorations.
COVER PAGE
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWELDGEMENT
ABSTRACT
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF THE PROJECT
1.2 PROBLEM STATEMENT
1.3 AIMS AND OBJECTIVES
1.4 SIGNIFICANCE OF THE PROJECT
1.5 SCOPE OF THE PROJECT
1.6 APPLICATION OF THE PROJECT
1.7 LIMITATION THE PROJECT
1.8 METHODOLOGY
1.9 PROJECT ORGANISATION
CHAPTER TWO
LITERATURE REVIEW
2.1 DESCRIPTION OF A RELAY
2.2 HISTORY OF POWER FAILURE AND SYSTEM RELIABILITY
2.3 TYPES OF POWER FAILURE
2.4 PROTECTING THE POWER SYSTEM FROM FAILURE
2.5 RESTORING POWER AFTER A WIDE-AREA OUTAGE
2.6 POWER FAILURE INEVITABILITY AND ELECTRIC SUSTAINABILITY
2.7 MITIGATION OF POWER OUTAGE FREQUENCY
CHAPTER THREE
SYSTEM METHODOLOGY
3.1 BLOCK DIAGRAM OF THE SYSTEM
3.2 CIRCUIT DESCRITION AND OPERATION
3.1 SYSTEM CIRCUIT DIAGRAM
CHAPTER FOUR
4.0 TEST AND RESULT ANALYSIS
4.1 CONSTRUCTION PROCEDURE
4.2 ASSEMBLING OF SECTIONS
4.3 TESTING OF SYSTEM OPERATION
4.4 CONSRUCTION OF THE CASING
4.5 ECONOMIC OF THE PROJECT
4.6 PROJECT VIABILITY
4.7 RELIABILITY
4.8 PROJECT EVALUATION
4.9 TESTING, TROUBLESHOOTING AND REMEDY
4.10 TROUBLE SHOOTING AND REMEDY
CHAPTER FIVE
5.1 CONCLUSION
5.2 RECOMMENDATION
REFERENCES
Design And Construction Of A 3.5KVA Automatic Inverter Changeover. (n.d.). UniTopics. https://www.unitopics.com/project/material/design-and-construction-of-a-3-5kva-automatic-inverter-changeover/
“Design And Construction Of A 3.5KVA Automatic Inverter Changeover.” UniTopics, https://www.unitopics.com/project/material/design-and-construction-of-a-3-5kva-automatic-inverter-changeover/. Accessed 10 November 2024.
“Design And Construction Of A 3.5KVA Automatic Inverter Changeover.” UniTopics, Accessed November 10, 2024. https://www.unitopics.com/project/material/design-and-construction-of-a-3-5kva-automatic-inverter-changeover/
Here’s a typical structure for Design And Construction Of A 3.5KVA Automatic Inverter Changeover research projects:
- The title page of Design And Construction Of A 3.5KVA Automatic Inverter Changeover should include the project title, your name, institution, and date.
- The abstract of Design And Construction Of A 3.5KVA Automatic Inverter Changeover should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
- The introduction of Design And Construction Of A 3.5KVA Automatic Inverter Changeover should provide the background information, outline the research problem, and state the objectives and significance of the study.
- Review existing research related to Design And Construction Of A 3.5KVA Automatic Inverter Changeover, identifying gaps the study aims to fill.
- The methodology section of Design And Construction Of A 3.5KVA Automatic Inverter Changeover should describe the research design, data collection methods, and analytical techniques used.
- Present the findings of the Design And Construction Of A 3.5KVA Automatic Inverter Changeover research study using tables, charts, and graphs to illustrate key points.
- Interpret Design And Construction Of A 3.5KVA Automatic Inverter Changeover results, discussing their implications, limitations, and potential areas for future research.
- Summarize the main findings of the Design And Construction Of A 3.5KVA Automatic Inverter Changeover study and restate its significance.
- List all the sources you cited in Design And Construction Of A 3.5KVA Automatic Inverter Changeover project, following a specific citation style (e.g., APA, MLA, Chicago).