Design And Construction Of 25 Amps Single Phase Automatic Change Over

TABLE OF CONTENTS

Title page
Approval page
Dedication
Acknowledgement
Abstract
Table of content

CHAPTER ONE
1.0 INTRODUCTION
1.1 General Description and application
1.2 Block Diagram representation

CHAPTER TWO
2.0 THEORY OF OPERATION
2.1 The General Starter
2.2 The Change Over Switch
2.3 The General Turn Off Switch
2.4 The Power Supply

CHAPTER THREE
COMPONENT DESCRIPTION AND RATING
THE COMPONENT USED FOR THE PROJECT ARE LISTED
3.0 Definition And Analysis Of Component And Ratings
3.1 The Component Used For The Project
3.2 Power Transformers
3.3 Relays
3.4 Contactors
3.5 Battery
3.6 Switch
3.7 Capacitors
3.8 Capacitor Ics
3.9 Logics Ics
3.10 Timer
3.11 Diodes
3.12 Indicator lamps
3.13 Circuit breaker
3.14 Wires jumpers and connectors
3.15 Transistors
3.16 Resistors

CHAPTER FOUR
4.0 CIRCUIT ANALYSIS
4.1 The Voltage Converters
4.2 The Comparators
4.3 The Logic Gates
4.4 The Generator Starter
4.5 The Change Over Switch

CHAPTER FIVE
CONSTRUCTION AND ECONOMIC OF THE PROJECT
5.0 Construction Of The Casing
5.1 Economic Of The Project
5.2 Reliability
5.3 Maintainability
5.4 Project Evaluation

CHAPTER SIX
6.0 TESTING
6.1 Trouble Shooting And Remedy

CHAPTER SEVEN
Conclsuion
References

APA

Design And Construction Of 25 Amps Single Phase Automatic Change Over. (n.d.). UniTopics. https://www.unitopics.com/project/material/design-and-construction-of-25-amps-single-phase-automatic-change-over/

MLA

“Design And Construction Of 25 Amps Single Phase Automatic Change Over.” UniTopics, https://www.unitopics.com/project/material/design-and-construction-of-25-amps-single-phase-automatic-change-over/. Accessed 19 September 2024.

Chicago

“Design And Construction Of 25 Amps Single Phase Automatic Change Over.” UniTopics, Accessed September 19, 2024. https://www.unitopics.com/project/material/design-and-construction-of-25-amps-single-phase-automatic-change-over/

WORK DETAILS

Chapters:
7
Pages:
98
Words:
12039

Here’s a typical structure for Design And Construction Of 25 Amps Single Phase Automatic Change Over research projects:

  • The title page of Design And Construction Of 25 Amps Single Phase Automatic Change Over should include the project title, your name, institution, and date.
  • The abstract of Design And Construction Of 25 Amps Single Phase Automatic Change Over should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
  • The introduction of Design And Construction Of 25 Amps Single Phase Automatic Change Over should provide the background information, outline the research problem, and state the objectives and significance of the study.
  • Review existing research related to Design And Construction Of 25 Amps Single Phase Automatic Change Over, identifying gaps the study aims to fill.
  • The methodology section of Design And Construction Of 25 Amps Single Phase Automatic Change Over should describe the research design, data collection methods, and analytical techniques used.
  • Present the findings of the Design And Construction Of 25 Amps Single Phase Automatic Change Over research study using tables, charts, and graphs to illustrate key points.
  • Interpret Design And Construction Of 25 Amps Single Phase Automatic Change Over results, discussing their implications, limitations, and potential areas for future research.
  • Summarize the main findings of the Design And Construction Of 25 Amps Single Phase Automatic Change Over study and restate its significance.
  • List all the sources you cited in Design And Construction Of 25 Amps Single Phase Automatic Change Over project, following a specific citation style (e.g., APA, MLA, Chicago).