As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually to every thing they do.
A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation after 40 seconds with out going through the point for manual operation. This project writing were organized in according way for easy understanding
Title Page
Approval Page
Acknowledgement
Abstract
Table Of Content
Table Of Figure
Chapter One
1.0 Introduction
1.1 Design Objectives
1.2 Significance Of The Project
1.3 The Project Report Models Relevant To The Design
Chapter Two
2.0 Literature Review
2.1 System Component Analysis
2.2 Theories And Models Relevant To The Design
Chapter Three
3.0 System Design
3.1 Description Of The System Building Blocks
3.2 System Specification And Block Diagram
3.3 Description Of Overall Operation Of The System
3.4 Complete Circuit Diagram Of The System
Chapter Four
4.0 Implementation Testing And Results
4.1 Packaging Of The System
Chapter Five
5.0 Cost Analysis
5.1 Conclusions And Recommendation/Suggestion
For Further Implementation
References
Automatic Change Over with Generator Trip Off typically refers to a system that involves an automatic transfer switch (ATS) and a generator in the context of power supply. Here’s a breakdown of the key components and the process:
- Automatic Transfer Switch (ATS): An ATS is a device that automatically transfers power supply from the main source (such as the utility grid) to a backup source (like a generator) when it detects a failure or interruption in the main power supply. ATS ensures a seamless transition to the alternative power source.
- Generator: This is the backup power source that is typically used when the main power supply fails. It could be a diesel generator, natural gas generator, or another type of power generation system.
- Changeover Process:
- Normal Operation: During normal operation, the facility or system is powered by the main electricity grid.
- Power Interruption Detection: When the ATS detects a failure or interruption in the main power supply, it initiates the changeover process.
- Transfer to Generator: The ATS triggers the switch to disconnect from the main power supply and connects to the generator. The generator starts up and begins supplying power to the system.
- Generator Trip Off: In some cases, if there is an issue with the generator (e.g., a fault, overload, or any other problem), the generator may automatically trip off. This means that the generator shuts down to prevent damage or further issues.
- Detection of Generator Trip Off: The ATS or a separate control system monitors the status of the generator. If a trip off is detected, it signifies that the generator is no longer supplying power.
- Return to Normal Operation or Alternate Source: Depending on the system design, the ATS may attempt to restart the generator or switch back to the main power supply if it has been restored. Alternatively, there may be provisions for manual intervention to address the generator issue before attempting to switch back.
The goal of this setup is to provide uninterrupted power supply during mains power failures and to ensure that the system can revert to the main power supply once it’s restored or address any issues with the generator. The automation in the process minimizes downtime and ensures a reliable power supply in critical applications.
Construction Of Automatic Change Over With Generator Trip Off. (n.d.). UniTopics. https://www.unitopics.com/project/material/construction-of-automatic-change-over-with-generator-trip-off/
“Construction Of Automatic Change Over With Generator Trip Off.” UniTopics, https://www.unitopics.com/project/material/construction-of-automatic-change-over-with-generator-trip-off/. Accessed 22 November 2024.
“Construction Of Automatic Change Over With Generator Trip Off.” UniTopics, Accessed November 22, 2024. https://www.unitopics.com/project/material/construction-of-automatic-change-over-with-generator-trip-off/
Here’s a typical structure for Construction Of Automatic Change Over With Generator Trip Off research projects:
- The title page of Construction Of Automatic Change Over With Generator Trip Off should include the project title, your name, institution, and date.
- The abstract of Construction Of Automatic Change Over With Generator Trip Off should be a summary of around 150-250 words and should highlight the main objectives, methods, results, and conclusions.
- The introduction of Construction Of Automatic Change Over With Generator Trip Off should provide the background information, outline the research problem, and state the objectives and significance of the study.
- Review existing research related to Construction Of Automatic Change Over With Generator Trip Off, identifying gaps the study aims to fill.
- The methodology section of Construction Of Automatic Change Over With Generator Trip Off should describe the research design, data collection methods, and analytical techniques used.
- Present the findings of the Construction Of Automatic Change Over With Generator Trip Off research study using tables, charts, and graphs to illustrate key points.
- Interpret Construction Of Automatic Change Over With Generator Trip Off results, discussing their implications, limitations, and potential areas for future research.
- Summarize the main findings of the Construction Of Automatic Change Over With Generator Trip Off study and restate its significance.
- List all the sources you cited in Construction Of Automatic Change Over With Generator Trip Off project, following a specific citation style (e.g., APA, MLA, Chicago).